The Heke Brewery

The Heke Brewery

Client:              The Heke Brewery
Location:              Waiheke, Auckland
Project Value:     Undisclosed
Sector:                  Wastewater

PROJECT DESCRIPTION

The Heke Brewery generates wastewater from brewing operations alongside hospitality loads. On Waiheke, there is no public sewer network to rely on, so wastewater must be fully managed on site.

GWE characterised variable wastewater volumes and strength driven by production cycles and visitor demand, with stringent environmental expectations in a coastal island setting.

We designed a robust on-site treatment system sized for peak conditions and integrated it with the site’s operations and layout. GWE also completed engineering certification and sign-off to support compliance.

    The result is a dependable system that delivers compliant discharge and resilience during peak loads – enabling business growth without compromising Waiheke’s environmental values.

    GWE’s Waiheke experience spans vineyards, groves and hospitality, bringing engineering rigour tuned to island conditions.

    SERVICES PROVIDED

    • Site and soil investigations
    • Characterisation of brewery and hospitality wastewater
    • Design of a robust on-site treatment system sized for peaks
    • Integration with site operations and layout
    • Engineering certification and sign-off